Skip to main navigation Skip to search Skip to main content

SBTn basic surveying for tunnelling

  • Klaus Macheiner
  • , Herbert Döller
  • , Wilhelm Jachs
  • , Gerhard Kienast
  • , Norbert Kühtreiber
  • , Arnold Eder
  • , Johannes Fleckl

Research output: Contribution to journalArticlepeer-review

Abstract

Major tunnel projects like the new Semmering Base Tunnel require intensive design work long before construction can start. Design work is based on basic surveying, which is subject to particular requirements on major projects of engineering geodesy. The most important basis is a homogeneous and stress-free basic control network for position and height, represented by suitable stabilised points. The conception and implementation of this basic control network poses stringent requirements for the surveyor. On the one hand, great precision and reliability are required, and on the other hand design requirements have to be considered along with the numerous geodetic and geophysical considerations. The most challenging work, which has to be undertaken above ground for the later tunnelling works, is described in detail in this article
Translated title of the contributionGrundlagenvermessung für den Tunnelvortrieb
Original languageEnglish
Pages (from-to)713-724
JournalGeomechanics and Tunnelling
Volume6
Issue number6
DOIs
Publication statusPublished - 2013

Fields of Expertise

  • Sustainable Systems

Treatment code (Nähere Zuordnung)

  • Theoretical
  • Experimental

Fingerprint

Dive into the research topics of 'SBTn basic surveying for tunnelling'. Together they form a unique fingerprint.

Cite this