Instationäre Füll- und Entleervorgänge bei der Auslegung der Oberkammer des Wasserschlosses Limberg II

Translated title of the contribution: Unsteady filling and draining cycles in designing the upper chamber of the surge tank Limberg II

Research output: Chapter in Book/Report/Conference proceedingConference paper

Abstract

The pump storage hydro power plant Limberg II of the hydro power scheme Glockner-Kaprun, Austria, will generate power using the difference in height between two reservoirs. A two-chamber surge tank will be built between the pressure tunnel and the pressure shaft. The design of this surge tank was checked by a hydraulic model test with a scale o 1:30. This article focuses on the unsteady filling and draining cycles which have to be considered in the design of the upper chamber of the surge tank.
Translated title of the contributionUnsteady filling and draining cycles in designing the upper chamber of the surge tank Limberg II
Original languageGerman
Title of host publicationTalsperren im Wandel
Subtitle of host publicationBeiträge zur Tagung am 14. bis 16. April 2010 im Eurogress Aachen
Place of PublicationAachen
PublisherShaker-Verlag GmbH
Pages239-246
Volume158
ISBN (Print)978-3-8322-9043-6
Publication statusPublished - 2010
Event15. Deutsches Talsperrensymposium - Aachen, Germany
Duration: 14 Apr 201016 Apr 2010

Publication series

NameMitteilungen des Lehrstuhls und Instituts für Wasserbau und Wasserwirtschaft der Rheinisch-Westfälischen Technischen Hochschule Aachen
Volume158

Conference

Conference15. Deutsches Talsperrensymposium
Country/TerritoryGermany
CityAachen
Period14/04/1016/04/10

Treatment code (Nähere Zuordnung)

  • Experimental

Fingerprint

Dive into the research topics of 'Unsteady filling and draining cycles in designing the upper chamber of the surge tank Limberg II'. Together they form a unique fingerprint.

Cite this