Abstract
In this paper, the effects of coordinated operation management of embedded HVDC links and phase shifting transformers on the optimal redispatch costs and volumes are examined. The underlying optimization problem, including these power flow controlling devices, is formulated for linear optimization using DC load flow equations. The evaluation is based on the results of a year-round simulation of the expected energy market and network situation of the ENTSO-E region of the year 2025. The results highlight the need for coordinated operation management of PFCs since uncoordinated operation management increases the accruing redispatch costs.
| Translated title of the contribution | Effects of coordinated operation management of HVDC links and PSTs on the redispatch in a Central European case study |
|---|---|
| Original language | German |
| Pages (from-to) | 553-560 |
| Number of pages | 8 |
| Journal | Elektrotechnik und Informationstechnik |
| Volume | 138 |
| Issue number | 8 |
| DOIs | |
| Publication status | Published - Dec 2021 |
ASJC Scopus subject areas
- Electrical and Electronic Engineering
Fingerprint
Dive into the research topics of 'Effects of coordinated operation management of HVDC links and PSTs on the redispatch in a Central European case study'. Together they form a unique fingerprint.Cite this
- APA
- Standard
- Harvard
- Vancouver
- Author
- BIBTEX
- RIS